Leeways solar farm power supply

We excavated the trenches at the required/ specific measurements, once cables had been laid we reinstated the ground with the appropriate materials, some tarmac, some turf and others concrete.

 

 

Retaining wall in Newnham

The steep garden of this house was slipping towards the house. We retained the ground using gabion baskets and levelled off areas to make it more useable.

 

Hillside Brewery- driveway subsidence

The driveway had been damaged by water run and started to subside. We added new drainage and repaired the driveway.

 

Garden re-design in Bristol

The client got in touch with us and asked for his garden to be re-designed to make it a more useable space. We added clean, modern lines with rendered planters and AstroTurf for a low maintenance option.

 

Gloucester Cathedral Project Pilgrim

Installation of limestone steps and decorative works. A great opportunity to work with such precious materials.

New Saw Mill slab works at Westonbirt Arboretum

Concrete slab poured for new saw mill at Westonbirt Arboretum. The client had specific dimensions and specifications due to the installation of the saw mill onto the slab after. We created a 50mm bevelled edge upstanding and power float finish including day joint.

Collapsed basement repair works in Cheltenham Town Centre

Client contacted us as rain water was seeping into their basement. We removed and repaired the pavement above before reinstating to original state and tanking from inside to ensure full repair.