New Saw Mill slab works at Westonbirt Arboretum
Concrete slab poured for new saw mill at Westonbirt Arboretum. The client had specific dimensions and specifications due to the installation of the saw mill onto the slab after. We created a 50mm bevelled edge upstanding and power float finish including day joint.
Collapsed basement repair works in Cheltenham Town Centre
Client contacted us as rain water was seeping into their basement. We removed and repaired the pavement above before reinstating to original state and tanking from inside to ensure full repair.