CHAS premium Plus

SDG Groundwork Solutions LTD is now CHAS PREMIUM PLUS accredited. We are also accredited with SMAS worksafe and Severn Trent and Welsh Water.

All of our employees are qualified with either SSSTS, CSCS, CPCS, Streetworks, Health and Safety in Construction and first aid.

 

 

Underpinning- Bristol

We recently carried out some underpinning works in the centre of Bristol, to support existing walls and high ground. We excavated a swimming pool base and then concrete blinded it ready for a swimming pool to be installed safely.

JCB Fastrac 3230- 270 hp 65kph

SDG Groundwork Solutions run a JCB Fastrac 3230 Tractor, 270 hp 65kph.

This can also be hired alongisde a 7T dump trailer, and many attachments to include snow plough, gritting box, road brush and many more. Get in touch for more information. 

Footings and oversite

Footings and oversite excavated as per drawings provided for new large dwelling. A single layer of mesh was laid before concrete trench fill.

 

New Saw Mill slab works at Westonbirt Arboretum

Concrete slab poured for new saw mill at Westonbirt Arboretum. The client had specific dimensions and specifications due to the installation of the saw mill onto the slab after. We created a 50mm bevelled edge upstanding and power float finish including day joint.

Collapsed basement repair works in Cheltenham Town Centre

Client contacted us as rain water was seeping into their basement. We removed and repaired the pavement above before reinstating to original state and tanking from inside to ensure full repair.